A 300 Lot 3 Phase job, our contract included all onsite underground utilities, rock, curb and paving. The Offsite work included two Penn DOT Permits which highlighted a storm sewer construction and a box culvert extension, full depth paving restoration and widening and full width milling and overlay.
A 125 Lot, 2 Phase job. The contract included all excavation and utility work. The major parts of the job included two Penn DOT widenings, 27 Foot Deep Sanitary Sewer Install, Redesign of the sanitary to eliminate Grinder Pumps and a 120lf Box Culvert.
A 30 Lot project, located in East Norriton, PA, included offsite renovation of the storm sewer to allow for basin outflow. David Erb Contractors' contract included all underground utilities and excavation, including a 10,000cy import.
This 11 Lot Subdivision located in Lower Gwynedd, PA was an extension of an existing subdivision. Keeping the site clean and safe at all time was of utmost importance, including deliveries in and out of this site. This job had a ten foot deep Underground detention basin in solid rock. We used hydraulic hammer mounted on an excavator to perform the necessary cut.
A well known area restaurant before the Holiday Season, this project was a busy place. Including shifting traffic patterns and parking areas to accomadate patrons of the restaurant while conducting utility and grading work nearby.
Located in Quakertown, PA this project included a Double Stream crossing, Pump Station, 13 foot tall, 12,000 SF Retaining Wall and Penn DOT Widening and full width Mill and Overlay.