A 300 Lot 3 Phase job, our contract included all onsite underground utilities, rock, curb and paving. The Offsite work included two Penn DOT Permits which highlighted a storm sewer construction and a box culvert extension, full depth paving restoration and widening and full width milling and overlay.
A 125 Lot, 2 Phase job. The contract included all excavation and utility work. The major parts of the job included two Penn DOT widenings, 27 Foot Deep Sanitary Sewer Install, Redesign of the sanitary to eliminate Grinder Pumps and a 120lf Box Culvert.